When a plant decides to switch from conventional oil or gas to a chemical fuel such as waste solvent, the cost of converting steam boiler to chemical fuel firing becomes a critical line‑item in the capital budget. Our conversion kit provides a turn‑key solution that minimizes engineering time, shortens shutdown periods, and delivers a predictable, transparent price structure. Designed for mid‑size to large industrial boilers (5‑100 MW), the kit integrates flame‑stabilising burners, fuel‑handling modules, and a control package that meets the most stringent emission regulations.
1. Fuel Conditioning – The kit includes a pre‑heater and filtration system that brings the chemical fuel to the required temperature and removes particulates that could affect burner stability.
2. Burner Replacement – Our low‑NOx, high‑efficiency burners snap into the existing furnace head, eliminating the need for structural modifications.
3. Control Integration – A PLC‑based controller links to the plant’s DCS, providing real‑time monitoring of fuel flow, combustion temperature, and emissions.
4. Commissioning & Training – Certified engineers perform a 3‑day start‑up, followed by on‑site operator training to ensure safe, optimal operation.
The entire process is engineered to keep boiler downtime below 48 hours, allowing a rapid return on investment while keeping the cost of converting steam boiler to chemical fuel firing within a tight, pre‑approved budget.
| Parameter | Range | Unit |
|---|---|---|
| Boiler Capacity | 5 – 100 | MW |
| Fuel Type | Solvent‑based waste, Glycol, Phenol mixtures | – |
| Maximum Fuel Flow | 0.8 – 12 | kg/s |
| Emission Limit (NOx) | ≤ 200 | mg/Nm³ (stack) |
| Control Interface | Modbus/TCP, Profibus DP | – |
All parameters are adjustable to match the existing boiler geometry and the specific chemical fuel profile supplied by the customer. Our engineering team prepares a detailed scope and cost breakdown before any purchase order is issued.
For a 20 MW boiler the package price usually falls between $300 k and $450 k, inclusive of burners, fuel‑handling hardware, control integration, and on‑site commissioning. Exact figures depend on fuel composition, required emission controls, and any site‑specific civil work.
Our kits are engineered per project, so the MOQ is effectively one full‑scale conversion. We can also supply a scaled‑down pilot kit for laboratory validation, starting at a 10 % capacity of the target boiler.
Once the scope and cost are approved, manufacturing and pre‑assembly require 15‑45 days, depending on order size and current production load. Shipping and customs clearance add another 7‑14 days for most international ports.
All components carry a 24‑month warranty against manufacturing defects. We also offer a 12‑month on‑site service contract that includes quarterly performance checks and remote diagnostics via our secure cloud portal.
Ready to evaluate the financial impact and technical fit for your facility?
Request a Detailed Quote