Our explosion proof burner for chemical boiler factory applications delivers consistent, high‑temperature fire while fully protecting against ignition of volatile atmospheres. Engineered for continuous duty in ATEX‑classified zones, the unit integrates a robust stainless‑steel combustion chamber, a sealed electronic control module, and a flame‑holding safety valve. It is the go‑to solution for process plants that require steam generation, heating, or drying where flammable gases, vapors, or dust are present.
The burner is supplied as a turn‑key package that can be mounted directly onto existing boiler headers or installed as a stand‑alone firebox. All critical components are sealed to IP66 standards, and the housing meets IECEx and ATEX Zone 1/2 requirements, ensuring that the equipment can be safely operated without additional explosion‑mitigation measures.
| Parameter | Range / Options | Unit |
|---|---|---|
| Thermal Output | 0.5 – 5.0 | MW |
| Fuel Type | Natural Gas / LPG / Propane | – |
| Operating Pressure | 1.0 – 3.5 | MPa |
| Ex‑Proof Rating | ATEX Zone 1, IECEx Cat. 3 | – |
| Material | 304/316L Stainless Steel, Ceramic Igniter | – |
| Control Interface | Digital (Modbus TCP/IP) / Analog 4‑20 mA | – |
| Warranty | 24 months parts & labor | – |
All dimensions and performance curves can be adapted to the specific boiler geometry and process requirements upon request.
The burner complies with the most stringent global explosion‑prevention standards:
Each unit is shipped with a full test report, CE marking, and an installation guide that details the required grounding, venting, and routine inspection schedule.
We accept single‑unit orders for prototype or pilot‑plant projects. For full‑scale production, the typical MOQ is 5 units, which allows us to optimize material procurement and machining cycles.
Yes. Our engineering team can integrate a dual‑fuel manifold and automatic switch‑over logic at no extra tooling cost, provided the design change is confirmed during the quotation stage.
Standard lead time ranges from 15 to 45 days, depending on the selected options and the required certification documentation. Rush orders can be accommodated with an additional surcharge.
Our qualified service engineers can travel to your facility for mechanical alignment, electrical integration, and performance commissioning. Installation assistance is billed separately and scheduled after the order is shipped.
Ready to secure a safe, high‑efficiency heat source for your chemical boiler? Contact our technical sales team today to discuss your specific hazard classification, required output, and any customization needs.
Send Inquiry