Our low cost chemical industry steam generator factory delivers robust, energy‑efficient steam generation for petrochemical, polymer, and specialty chemical plants. Designed for continuous‑duty operation, the units provide reliable saturated or super‑heated steam while keeping capital and operating expenses to a minimum. Engineers and procurement teams trust our factory‑built generators for process heating, reactor temperature control, and distillation column reboilers.
Each generator is fabricated in our dedicated production line, ensuring consistent quality, rapid delivery, and the flexibility to tailor key parameters such as capacity, pressure rating, and fuel type. Because we operate as a low cost chemical industry steam generator factory, we eliminate the markup of middlemen and pass the savings directly to you.
| Parameter | Range | Unit | Notes |
|---|---|---|---|
| Steam Capacity | 0.5 – 30 | t/h | Continuous duty, selectable |
| Design Pressure | 10 – 30 | bar(g) | EN 13445 compliant |
| Steam Temperature | 150 – 250 | °C | Saturated or super‑heated |
| Fuel Type | NG / Fuel Oil | – | Dual‑fuel optional |
| Efficiency (Net) | 85 – 92 | % | Typical at rated load |
| Dimensions (L×W×H) | 1500‑3000 × 1200‑2200 × 1800‑2500 | mm | Custom layout available |
*All values are indicative. Final specifications are defined during the engineering phase to match your process requirements.*
The steam generators are deployed across a broad spectrum of chemical operations:
Selecting a generator from a specialised low cost chemical industry steam generator factory translates into measurable project benefits:
Our factory can produce a single‑unit prototype for pilot‑plant validation. For series production the typical MOQ is 3 units, which balances tooling cost and delivery speed.
Yes. Our engineering team configures burners to handle natural gas, low‑sulphur fuel oil, or a dual‑fuel arrangement. Fuel‑quality parameters are defined during the specification stage.
All generators carry a 12‑month parts and labour warranty, extendable to 36 months at a nominal cost. We also provide optional on‑site maintenance contracts.
Contact our sales engineering team with your required steam capacity, pressure, and fuel preference. We will deliver a preliminary technical proposal within 5 business days.
Ready to lower your steam generation cost?