As a leading pharmaceutical drying oven clean steam boiler manufacturer, we deliver fully engineered units that combine precise drying performance with hygienic steam generation. Designed for GMP‑compliant facilities, the system provides uniform heat distribution for bulk powders, tablets, and sterile components while the clean‑steam boiler supplies contaminant‑free vapor for sterilization, cleaning and process integration. The modular architecture allows a single footprint to serve both drying and steam needs, reducing plant floor space and simplifying utility management.
Our ovens are built on a stainless‑steel (SS304L) frame, feature programmable temperature ramps, and are equipped with an insulated, double‑walled chamber that meets ISO 14644‑1 clean‑room standards. The paired boiler operates on low‑NOx gas or electric heating, delivering steam at 0.8–1.2 MPa with a total dissolved solids (TDS) level below 5 ppm, ensuring compliance with USP <1111> requirements for pharmaceutical steam.
| Parameter | Range / Option | Default |
|---|---|---|
| Oven chamber volume | 0.5 m³ – 5 m³ | 2.0 m³ |
| Maximum drying temperature | 120 °C – 250 °C | 180 °C |
| Steam pressure (boiler) | 0.8 MPa – 1.2 MPa | 1.0 MPa |
| Steam purity (TDS) | ≤5 ppm (optional ≤1 ppm) | ≤5 ppm |
| Control system | PLC with HMI, SCADA‑ready, or DCS integration | PLC + 10‑inch touch panel |
| Duty cycle | Continuous / Intermittent | Continuous |
All dimensions, temperature limits and control options can be adjusted during the engineering phase to match specific process windows or regulatory constraints.
The integrated oven‑boiler platform fits a wide spectrum of pharmaceutical operations:
We accept single‑unit projects for pilot lines, but volume discounts start at a 3‑unit order. Each unit is fully engineered to your specifications, regardless of quantity.
Yes. While the integrated solution offers the best footprint and energy‑recovery benefits, we can ship the drying oven and clean‑steam boiler as independent modules for facilities that already have a dedicated steam system.
Standard lead time ranges from 15 to 45 days, depending on configuration complexity and material availability. Expedited production can be arranged with a surcharge.
All units carry a 24‑month comprehensive warranty covering parts, labor and on‑site commissioning. Our technical service team is available 24 × 7 for critical failures, and we offer optional extended service contracts and spare‑part kits.
Whether you need a single pilot‑line oven, a full‑scale production dryer, or a combined clean‑steam boiler for sterility assurance, our engineering team will work with you to define the optimal configuration. Reach out now to receive a detailed quotation, technical drawing package, and project timeline.
Request a Quote