The pulverized coal boiler for chemical power plant is engineered to meet the demanding thermal requirements of large‑scale chemical production facilities. Designed for continuous operation, this boiler converts finely ground coal into high‑temperature, high‑pressure steam that drives turbines, supports process heating, and ensures reliable power supply across the plant’s critical units. With robust construction, flexible capacity options, and compliance with international safety standards, it delivers the performance and durability procurement managers expect from a mission‑critical asset.
| Parameter | Typical Range | Units |
|---|---|---|
| Steam Output | 150‑1,200 | t/h |
| Operating Pressure | 10‑25 | MPa |
| Design Temperature | 350‑540 | °C |
| Coal Feed Rate | 200‑2,500 | kg/h |
| Efficiency (Net) | ≥38 | % |
| Duty Cycle | ≥90% | — |
| Material of Construction | Carbon steel / Low‑alloy steel | — |
| Control System | DCS‑integrated, PLC optional | — |
The pulverized coal boiler for chemical power plant is suited to a range of high‑temperature processes, including:
We accept single‑unit orders for pilot‑scale installations and bulk orders for multi‑plant projects. The MOQ is determined by the selected capacity range and any special material or control‑system requirements.
Yes. Our engineering team works with your site‑layout drawings to modify the boiler footprint, feed‑water connections, and flue‑gas routing. All changes remain within the standard certification envelope.
Standard models ship within 15‑45 days after contract signing and receipt of a 30 % deposit. Fully custom configurations may require 60‑90 days, depending on material grades and control‑system integration.
All units come with a standard 24‑month warranty covering material defects and manufacturing workmanship. Extended warranties and on‑site service packages are available upon request.
Ready to boost steam reliability and reduce operating costs in your chemical facility? Contact our technical sales team for a no‑obligation quotation, detailed engineering support, and delivery schedule.