The shop assembled packaged chemical steam system delivers reliable, high‑purity steam directly to reactors, distillation columns, and heat‑exchangers in petrochemical, pharmaceutical, and specialty‑chemical plants. Engineered as a factory‑built, fully tested unit, it eliminates on‑site assembly time, reduces commissioning risk, and meets the stringent quality requirements of modern process facilities. Our modular design supports rapid integration into existing plant layouts while providing the flexibility to scale capacity as production demands evolve.
A typical system consists of a high‑efficiency boiler, a dedicated feed‑water treatment module, a steam‑distribution header, and a control panel housed within a single insulated enclosure. Feed water is pre‑treated to prevent scaling, then heated by the boiler’s burners (natural gas, fuel oil, or dual‑fuel). The resulting saturated or superheated steam is routed through the header to downstream process equipment. Advanced PLC controls monitor pressure, temperature, and flow, automatically adjusting fuel rates to maintain set‑points while optimizing fuel consumption.
| Parameter | Range / Options | Standard |
|---|---|---|
| Steam Capacity | 5 – 150 t/h (modular) | ISO 9906 |
| Operating Pressure | 0.5 – 10 bar(g) | ASME BPVC |
| Fuel Types | Natural gas, fuel oil, dual‑fuel | ISO 7243 |
| Control Interface | PLC with HMI, Modbus/TCP, OPC-UA | IEC 61131‑3 |
| Material of Construction | 316L SS, Hastelloy C‑276 (optional) | ASTM A240 |
| Warranty | 24 months parts & labor | Standard |
All units are fabricated under ISO 9001 quality‑management procedures and undergo third‑party pressure‑test certification in accordance with PED (EU) and ASME Section I. Electrical components meet IEC 60335‑2‑23, while the control system satisfies IEC 61508 SIL‑2 requirements. Documentation includes a complete CE‑Marking package, a Material Safety Data Sheet (MSDS) for the boiler water chemistry, and a full traceability matrix for critical welds and fittings.
We accept orders for a single turnkey unit; however, volume discounts and standard‑part economies are applied for batches of five or more units.
Yes. As part of the packaging service we can pre‑charge the boiler with de‑mineralised water to a level that supports immediate start‑up upon connection to the plant’s fuel supply.
Standard configurations ship within 15‑30 days after receipt of a signed purchase order and engineering drawing approval. Highly customised options may require 45 days.
Our quotation can include optional installation and commissioning services performed by certified technicians. This service typically adds 2‑3 days of on‑site work and is billed separately.
If your plant requires reliable, compliant steam generation with minimal on‑site effort, contact our engineering team today. We’ll review your process parameters, suggest the optimal capacity, and provide a detailed quotation within 48 hours.
Email us or call +1‑800‑555‑0199 to start the conversation.