Our 25 ton pulverized coal boiler is engineered for continuous, high‑capacity steam production in power‑generation, petrochemical, and large‑scale industrial facilities. Whether you are updating an existing plant or building a new cogeneration unit, the 25 ton pulverized coal boiler price list provides transparent cost benchmarks for a turnkey solution that meets stringent efficiency and emission standards. Designed for a nominal output of 25 tons of steam per hour, the system integrates advanced combustion control, low‑NOx burners, and modular construction for rapid on‑site assembly.
Pulverized coal is ground to a fine powder (30–80 µm) and injected into the furnace where it mixes with preheated secondary air. The high surface‑to‑volume ratio ensures rapid ignition and a stable flame front, delivering a uniform heat flux across the boiler tubes. Precise air‑fuel ratio control, managed by a digital PLC system, maximizes combustion efficiency (typically > 90 %) while keeping nitrogen oxide emissions below regulatory limits. The generated heat transfers to the water‑wall tubes, producing saturated steam that can be superheated on demand.
| Parameter | Standard Value | Optional Range |
|---|---|---|
| Steam Output | 25 t/h | 20–30 t/h |
| Design Pressure | 2.0 MPa | 1.6–2.5 MPa |
| Design Temperature | 450 °C | 420–470 °C |
| Fuel Consumption | ≈ 200 kg/h | 180–220 kg/h |
| Efficiency (HHV) | > 90 % | 88‑92 % |
| Emission (NOx) | ≤ 150 mg/Nm³ | ≤ 200 mg/Nm³ |
| Water‑wall Material | Q235B Steel | Alloy‑X (higher corrosion resistance) |
| Control System | PLC‑based, SCADA ready | Optional DCS integration |
Our standard MOQ is one complete boiler package, which includes the furnace, water‑wall, burners, and control panel. Smaller pilot‑scale units can be fabricated on request, but lead times will increase.
The base price covers the core boiler and standard controls. Options such as low‑NOx burners, alloy‑enhanced tubes, or DCS integration are itemized separately in the price list, allowing you to select only the features that align with your project budget.
Standard units are shipped within 15‑45 days, depending on the selected options and current production schedule. Custom‑engineered variants may require up to 90 days.
All boilers carry a 12‑month warranty covering material defects and workmanship. Extended warranty packages (up to 36 months) and a full maintenance contract can be added at the time of purchase.
Ready to receive a detailed quotation?
Contact Our Sales Team