In a beverage processing plant coal boiler factory environment, reliability and efficiency are non‑negotiable. Our coal‑fired steam boilers are engineered to sustain continuous high‑temperature steam generation for large‑scale bottling, pasteurisation, and cleaning cycles. Designed with a focus on low emissions, rapid start‑up, and extended duty cycles, they minimise operational downtime while maximising energy utilisation – the exact mix procurement managers demand.
Our coal boiler is a purpose‑built, high‑capacity steam generator for beverage processing plant coal boiler factory lines. It delivers saturated or super‑heated steam up to 15 bar, supporting processes such as syrup concentration, sterilisation, and CIP (clean‑in‑place) systems. Constructed from food‑grade, corrosion‑resistant steel, the boiler complies with international hygiene regulations, ensuring that steam quality never compromises product safety.
Whether you operate a regional bottling hub or a multinational production complex, the unit can be customised for 1 000 kg/h to 10 000 kg/h steam output, with options for dual‑fuel capability, automated combustion control, and remote monitoring via SCADA. Our engineering team collaborates from concept through commissioning, guaranteeing seamless integration with existing plant utilities.
| Parameter | Range | Units |
|---|---|---|
| Steam Pressure (max) | 5 – 15 | bar |
| Steam Production | 1 000 – 10 000 | kg/h |
| Fuel Consumption | 0.8 – 1.2 | kg/kWh |
| Rated Thermal Power | 5 – 30 | MW |
| Operating Temperature | 150 – 300 | °C |
| Control System | PLC‑based with HMI | – |
| Warranty | 24 months | – |
*All values are indicative; final specifications are defined during the engineering phase to match your plant’s exact load profile.
The coal boiler integrates effortlessly into a variety of beverage‑industry processes:
Because the unit is built to operate under heavy duty cycles, it remains the preferred choice for plants that run 20+ hours per day, ensuring the steam network never becomes a bottleneck.
We work on a project‑by‑project basis, so there is no fixed MOQ. The design and tooling are adapted to each order, allowing small‑scale facilities to benefit from the same technology as large plants.
Yes. Our engineering team can integrate a natural‑gas or biomass secondary burner, providing operational flexibility during coal supply fluctuations.
Standard lead time ranges from 15 to 45 days, depending on the selected capacity and any optional accessories. Our in‑house fabrication and dedicated logistics network keep schedules predictable.
Absolutely. The boiler conforms to the hygiene, emission, and safety standards commonly required in beverage manufacturing facilities, and it can be supplied with food‑grade steam‑seal gaskets on request.
Contact our technical sales team today to discuss a tailor‑made solution that matches your plant’s steam demand, emission goals, and budget constraints.
Send an Inquiry