Our high‑efficiency coal boiler for palm oil processing factory applications delivers reliable steam generation under the demanding conditions of oil extraction and refining. Engineered for continuous duty cycles, the unit converts low‑grade coal into clean, controllable steam that drives palm oil sterilizers, boilers, and heat exchangers while maintaining strict emission limits. Designed for easy integration, the boiler fits standard plant footprints and can be customized to match the specific thermal load of any processing line.
The system follows a proven four‑stage process: (1) coal feeding via a low‑speed, anti‑jamming conveyor; (2) pulverization in a sealed grinder that produces a fine, uniform fuel dust; (3) combustion in a sealed furnace equipped with staged air injection and flue‑gas recirculation to maximize heat release; and (4) steam generation in a high‑conductivity, alloy‑lined boiler drum. Advanced PLC control continuously monitors furnace temperature, steam pressure, and emission parameters, automatically adjusting fuel flow and air ratios to keep efficiency above 85 % and CO₂ output within regulatory limits.
| Parameter | Typical Range | Units |
|---|---|---|
| Steam Output | 10 – 150 | t/h |
| Design Pressure | 1.0 – 2.5 | MPa |
| Coal Feed Rate | 200 – 1500 | kg/h |
| Thermal Efficiency | 85 – 90 | % |
| Emission (SO₂) | ≤ 150 | mg/Nm³ |
| Operating Temperature | 350 – 450 | °C |
All values are typical; each boiler can be engineered to meet exact load profiles, duty cycles, and local fuel characteristics. Customization options include multi‑stage air pre‑heating, secondary water‑tube superheaters, and optional flue‑gas desulfurization modules.
We accept single‑unit orders for pilot projects or full‑scale plants. Standard models start at 10 t/h steam output, and any configuration can be built to the buyer’s specifications.
Yes. The combustion chamber and fuel‑handling system are designed for easy retrofit. Our engineering team can supply a dual‑fuel kit that maintains efficiency while meeting local fuel availability.
Standard models are shipped within 30 – 45 days after receipt of a signed purchase order and initial deposit. Fully customized solutions require 45 – 75 days, depending on design complexity and component sourcing.
All units carry a 24‑month warranty covering manufacturing defects, furnace tubes, and control electronics. We also provide optional extended service contracts, remote monitoring, and spare‑parts stocking at your plant location.
Ready to boost steam reliability while cutting fuel costs? Contact our engineering sales team for a free feasibility study and a tailored quotation. Email us now or call +62 21 5555 1234 to discuss how our coal boiler for palm oil processing factory can be integrated into your next project.