Power plants, cement factories, and large‑scale process facilities that rely on coal‑fired boiler systems demand reliable oxygen removal to protect turbine blades, economizers, and heat exchangers. Our deaerator tank for industrial coal boiler system is engineered to operate continuously under high‑temperature steam cycles, ensuring the feedwater remains free of dissolved gases even during peak loads and rapid start‑ups. Whether you are retrofitting an aging plant or commissioning a new coal‑based generation unit, the tank integrates seamlessly with existing water‑treatment loops, providing consistent performance across harsh operating conditions.
The deaerator tank for industrial coal boiler system combines a vented storage vessel with a high‑efficiency spray‑type heat exchanger. Water enters the tank at ambient temperature, is heated by steam injection, and circulates through fine nozzles that maximize surface area for gas release. The design eliminates dissolved oxygen, carbon dioxide, and nitrogen, preventing corrosion and scaling in downstream boiler components. Constructed from low‑temperature carbon steel with a corrosion‑resistant lining, the unit meets the rigorous demands of continuous 24/7 operation while offering easy access for inspection and maintenance.
| Parameter | Typical Range | Unit |
|---|---|---|
| Design Pressure | 1.5 – 2.5 | MPa |
| Design Temperature | 120 – 200 | °C |
| Water Capacity | 5,000 – 50,000 | L |
| Oxygen Reduction | ≤ 0.5 ppb | (after treatment) |
| Material | Carbon steel 15Mn, EPDM lining | – |
| Connection Size | DN50 – DN200 | (flanged) |
| Warranty | 12 months | – |
We typically accept orders starting at a single unit, provided the required specifications are within our standard design envelope. For highly specialized dimensions or materials, the MOQ may be adjusted to cover tooling costs.
Absolutely. Our engineering team can scale the water capacity, vent size, and spray nozzle arrangement to match boiler outputs ranging from 30 MW up to 500 MW. Each configuration is validated through CFD simulations and prototype testing.
Standard models ship within 15‑30 days after receipt of a purchase order and engineering sign‑off. Customized builds generally require 30‑45 days, depending on the complexity of the modifications.
All units come with a 12‑month warranty covering material defects and workmanship. Our technical support team is available 24/7 for troubleshooting, and we provide on‑site commissioning assistance for large projects.
Ready to protect your coal‑fired boiler assets and improve plant reliability? Contact our engineering sales office today to discuss capacity, material options, and delivery schedules.
Request a Quote