Power plants, large‑scale district heating networks, and industrial complexes demand reliable, high‑output steam generation. Our heavy duty coal fired utility boiler factory specializes in delivering units that can sustain continuous operation at 24/7 duty cycles, handling loads from 30 MW up to 300 MW. Whether the need is for baseline generation in a coal‑rich region, supplemental steam for petrochemical processes, or heat recovery in a steel mill, our boilers integrate seamlessly with existing infrastructure while meeting strict emissions limits.
Typical deployments include:
Our factory manufactures robust coal‑fired boilers engineered for long‑term durability and high thermal efficiency. Each unit is fabricated from high‑grade low‑alloy steel, equipped with multi‑stage combustion chambers, and features automated feed‑water regulation. Designed for easy integration, the boilers support both on‑line and off‑line cleaning systems, reducing downtime and maintenance costs.
The modular design enables scaling from 30 MW to 300 MW without compromising performance. Optional upgrades include low‑NOx burners, flue‑gas desulfurization compatibility, and remote monitoring packages compliant with SCADA standards.
| Parameter | Typical Range | Units |
|---|---|---|
| Steam Output | 30 – 300 | MW |
| Thermal Efficiency | 85 – 92 | % |
| Design Pressure | 1.5 – 3.0 | MPa |
| Operating Temperature | 350 – 540 | °C |
| Coal Consumption | 0.35 – 0.45 | kg/kWh |
| Start‑up Time | 30 – 60 | minutes |
*All values are typical and can be refined during the engineering phase to match site‑specific fuel quality and load profile.
• **Proven reliability** – Over 15 years of continuous supply to national grids and private utilities.
• **Flexibility** – Modular construction allows phased expansion and easy retro‑fit of emission controls.
• **Turnkey support** – From site assessment and engineering design through to commissioning and after‑sales service.
• **Global compliance** – All units meet ISO 9001 quality management, ISO 14001 environmental, and regional emission standards without the need for additional certification work.
• **Cost‑effective operation** – High combustion efficiency reduces coal usage, while automated soot blowers extend intervals between manual cleanings.
We work with projects ranging from a single 30 MW unit to multi‑unit plants exceeding 1 GW. The MOQ is therefore project‑driven rather than a fixed number; we provide a detailed quotation after reviewing the required capacity and site conditions.
Yes. Our design team can integrate low‑NOx burners, staged combustion, and selective catalytic reduction (SCR) modules. These options are incorporated during the engineering phase and are fully compliant with most regional emission regulations.
Standard lead time ranges from 15 to 45 days for engineering, fabrication, and factory acceptance testing, depending on order size and optional equipment. Shipping logistics are coordinated to align with your project schedule.
All boilers carry a 24‑month warranty covering material defects and workmanship. In addition, we offer extended service contracts, on‑site spare parts kits, and 24/7 technical hot‑line support for rapid troubleshooting.
Ready to boost your plant’s efficiency with a proven, heavy duty coal fired utility boiler?
Send Your Inquiry Today