Our high pressure superheated steam coal boiler factory delivers turnkey boiler solutions that turn high‑grade coal into clean, high‑temperature steam for power generation, petrochemical processes, and heavy‑industry heating. Designed for continuous duty cycles and easy integration, each unit meets the rigorous demands of modern plants while adhering to global safety and emission standards.
From large‑scale power stations to sugar mills and steel complexes, our boilers are deployed where dependable, high‑energy steam is critical. Typical applications include:
| Parameter | Typical Range | Units |
|---|---|---|
| Steam Pressure | 12 – 30 | MPa |
| Superheat Temperature | 380 – 540 | °C |
| Rated Capacity | 10 – 150 | t/h |
| Fuel Type | Anthracite, Bituminous, Low‑Ash Coal | — |
| Efficiency (Net) | 84 – 90 | % |
| Continuous Duty | ≥ 8,000 | hrs/yr |
All figures are customizable per order. Our engineering team fine‑tunes each boiler to match the exact steam demand, fuel quality, and site constraints of your project.
1. Fuel Preparation: Coal is pulverized to a fine powder and fed into the primary burner.
2. Primary Combustion: A staged air‑fuel mix ignites, producing a high‑temperature flame within the furnace.
3. Water‑Tube Evaporation: Water circulates through tubes exposed to the flame, turning into saturated steam.
4. Superheating: Saturated steam passes through the superheater bank, raising its temperature above the boiling point while maintaining pressure.
5. Steam Delivery: The high‑pressure, superheated steam exits through insulated headers to drive turbines or process equipment.
6. Exhaust Treatment: Flue gases are cooled, filtered, and treated to meet emission standards before release.
All units are manufactured in compliance with ISO 9001 quality management, ISO 14001 environmental management, and the ASME Boiler and Pressure Vessel Code. Our factories also hold CE marking for EU markets and adhere to the American Society of Mechanical Engineers (ASME) standards for pressure equipment. Safety interlocks, emergency shut‑down valves, and overload protection are integral to every design.
Our standard MOQ is one complete unit, which includes all modules, control systems, and optional emission controls. For larger projects we offer volume discounts and staggered delivery schedules.
Yes. Our engineering team can modify the burner geometry, grate system, and fuel‑handling equipment to accommodate low‑ash coal, biomass blends, or waste‑derived fuels while maintaining efficiency.
Standard models ship within 30–45 days after order confirmation and receipt of a 30% deposit. Fully customized solutions may require 45–70 days, depending on the complexity of the modifications.
Our factory partners and certified service teams can handle complete installation, pipe‑work integration, and start‑up testing. A typical commissioning period lasts 7–14 days, after which we hand over full documentation and training.
- **Proven Track Record:** Over 20 years of supplying boilers to power plants across Asia, Europe, and Africa.
- **End‑to‑End Support:** From feasibility studies and CFD analysis to after‑sales spare parts and 24/7 technical hotline.
- **Scalable Solutions:** Whether you need a 10 t/h pilot unit or a 150 t/h industrial plant, we deliver the same engineering rigor.
- **Cost Predictability:** Transparent pricing, fixed‑price contracts for the entire project, and optional performance guarantees.
Ready to power your facility with reliable, high‑efficiency steam?
Contact our sales team today for a free technical quotation and engineering consultation.