As a leading lignite coal fired power plant boiler supplier, we deliver purpose‑built boiler systems that convert low‑grade lignite into stable, high‑efficiency steam for base‑load electricity generation. Our designs meet the demanding operational cycles of utility‑scale plants, offering robust construction, flexible capacity ranges, and full compliance with international environmental and safety standards. Whether you are upgrading an existing fleet or commissioning a new facility, our turnkey solutions are engineered for long‑term performance and minimal downtime.
| Parameter | Typical Range | Unit | Notes |
|---|---|---|---|
| Steam Capacity | 50 – 800 | t/h | Modular design enables scaling |
| Operating Pressure | 12 – 25 | MPa | Designed for 24‑hour continuous duty |
| Feedwater Temperature | 180 – 260 | °C | Optimized for lignite moisture content |
| Overall Efficiency | 38 – 42 | % (net) | Measured at design load |
| Material Construction | SA-387/SA-210, 9Cr‑1Mo | – | Corrosion‑resistant for high sulfur fuels |
All parameters are adjustable based on site‑specific requirements, including fuel‑handling configuration, ambient conditions, and grid connection constraints.
Our lignite‑focused boiler platforms are selected for:
Each deployment is supported by a detailed engineering study that matches boiler sizing, fuel‑handling logistics, and grid interconnection requirements, ensuring optimal return on investment.
We work with utilities of all sizes. For fully customized designs the MOQ is one complete boiler train; for standard‑capacity units the minimum is a single package ready for factory assembly.
Yes. Our engineering team adjusts furnace geometry, combustion air distribution, and slag‑handling systems to accommodate moisture content ranging from 30 % to 55 % on a wet basis.
All new boilers come with a 24‑month manufacturer warranty covering material and workmanship. We also offer extended service contracts, on‑site spares, and 24 / 7 technical hot‑line assistance.
Standard models ship within 15‑45 days depending on order volume. Bespoke configurations typically require 8‑12 weeks, with progress updates provided weekly.
Ready to power your next lignite project with a proven boiler system?
Contact Our Engineering Team Today