Our overfire air ports for stoker fired coal boiler are engineered to optimise combustion, reduce emissions, and extend the service life of your plant. By delivering precisely‑controlled secondary air above the firebed, the ports improve flame stability, promote complete fuel burn, and help you meet strict environmental regulations without sacrificing boiler efficiency.
In a stoker‑fired system, primary air is supplied at the grate to transport coal and initiate combustion. The overfire air ports introduce a secondary stream of pre‑heated air directly into the post‑combustion zone. This staged‑air approach accomplishes three critical objectives:
The ports are mounted on a robust, high‑temperature alloy frame that can be bolted or welded to the furnace shell. Adjustable nozzles allow field technicians to fine‑tune the air‑to‑fuel ratio in real time, while the integrated pressure‑drop sensor feeds data to the boiler’s control system for automated optimisation.
| Parameter | Typical Range | Units |
|---|---|---|
| Port Diameter (inner) | 150‑350 | mm |
| Maximum Operating Temperature | 950‑1150 | °C |
| Material (body) | Inconel 625 / Hastelloy C276 | ‑ |
| Pressure Drop (full‑open) | 0.8‑2.5 | kPa |
| Connection Type | Flanged / Weld‑on | ‑ |
| Adjustment Mechanism | Manual screw / Pneumatic actuator | ‑ |
All dimensions, materials, and connection styles are fully configurable. Our engineering team works with you to match the port design to the specific furnace geometry, pressure‑drop budget, and maintenance strategy of your installation.
The overfire air ports are trusted in a variety of industrial environments:
Our ports are designed for rapid installation—typically two to three days for a standard 10‑port retrofit—minimising plant downtime and delivering measurable ROI within the first operating season.
We accept orders from a single unit for prototype testing up to full‑scale production runs. For quantities above 10 units, we can offer volume discounts and priority manufacturing slots.
Yes. Our standard mounting kits are designed for bolt‑on installation on most common furnace shells. In cases where weld‑on is preferred, we provide detailed welding guides and on‑site engineering support.
Standard production lead time is 15‑45 days, depending on material selection and order volume. Expedited machining and shipping are available on request.
All overfire air ports come with a 24‑month limited warranty covering material defects and workmanship. Our global service network handles on‑site inspections, calibration, and spare‑part replacement throughout the warranty period.
Ready to improve combustion efficiency, lower emissions, and extend the life of your stoker‑fired coal boiler? Contact our technical sales team for a free performance assessment and a customized quotation.
sales@yourcompany.com | +1 (800) 555‑0123