Our pulverized coal fired water tube boiler design delivers reliable, high‑temperature steam for power‑generation, process heating, and district heating projects. Engineered for continuous duty cycles, the boiler integrates a robust tube bundle, optimized combustion chamber, and advanced control systems to maximize thermal efficiency while minimizing emissions. Tailored to the stringent requirements of utility‑scale and heavy‑industry customers, the design can be customized for capacities ranging from 10 MW to 250 MW.
By selecting a water‑tube configuration, the system benefits from rapid steam response, superior heat transfer, and enhanced safety compared with fire‑tube alternatives. The modular layout simplifies on‑site assembly, routine maintenance, and future capacity upgrades.
| Parameter | Range | Unit | Typical Value |
|---|---|---|---|
| Steam Output | 10 – 250 | MW | 120 |
| Operating Pressure | 10 – 25 | MPa | 16 |
| Steam Temperature | 350 – 560 | °C | 460 |
| Fuel Consumption | 0.45 – 0.60 | kg/kWh (coal) | 0.52 |
| NOx Emission | < 150 | mg/MJ | 120 |
The flexible design serves a variety of high‑temperature steam demands:
Each installation can be adapted to local coal quality, ambient conditions, and plant integration constraints, ensuring optimal performance throughout the boiler’s lifecycle.
We accept single‑unit projects for engineering‑scale plants, but larger orders (≥3 units) benefit from volume pricing and synchronized delivery schedules.
Yes. Our design includes adjustable pulverizer settings, refractory lining options, and optional multi‑fuel burners to handle a wide range of calorific values while maintaining efficiency.
Standard lead time is 30–45 days, depending on capacity, material selection, and any special certification requirements.
All boilers ship with a 24‑month warranty covering material defects and workmanship. We also offer on‑site commissioning, training, and a 24/7 technical hotline for the duration of the warranty period.
Ready to boost your steam generation efficiency with a proven pulverized coal fired water tube boiler design?
Contact Our Engineering Team Today