Our rear‑arch design for coal‑fired chain grate boiler delivers a robust, high‑temperature‑resistant structure that supports the firebox, improves ash removal, and extends service life in demanding power‑generation environments. Engineered from premium-grade steel and optimized for seamless integration, this component is the backbone of reliable, continuous‑duty boiler operation, meeting the exacting standards of utility plants, industrial complexes, and large‑scale district heating systems.
The rear‑arch design for coal‑fired chain grate boiler is deployed across a variety of high‑capacity scenarios. In coal‑fired power stations, it sustains continuous 24‑hour operation with duty cycles exceeding 95 %. For cement kilns and steel‑mill cogeneration units, the arch endures rapid temperature fluctuations while maintaining structural integrity. Municipal district‑heating networks benefit from the design’s low‑maintenance ash handling, which reduces service intervals and keeps heat delivery uninterrupted.
| Parameter | Standard Range | Optional Upgrade |
|---|---|---|
| Material Grade | Q355B Steel (≤ 600 °C) | HRB400/HRB500 or ASTM A335 P91 (≥ 1200 °C) |
| Arch Height | 250 mm – 400 mm | Custom up to 600 mm |
| Maximum Working Pressure | 1.6 MPa | Up to 2.5 MPa (reinforced welds) |
| Connection Type | Welded flange (DN 150‑300) | Bolted flange with gasket (DN 350‑500) |
| Surface Finish | Rough‑shot (≤ 250 µm) | Polished (≤ 80 µm) for high‑temperature zones |
During combustion, the chain grate carries a moving bed of coal through the firebox. The rear arch forms a semi‑circular support that transfers vertical and lateral forces to the boiler’s outer shell. Its curvature creates a natural “chimney effect,” encouraging hot gases to flow uniformly while channeling ash toward the rear discharge slot. This geometry reduces turbulent eddies, resulting in more consistent heat transfer to the water‑tube bank and lower fuel consumption.
We accept orders from a single unit for prototype or engineering verification, but standard production runs start at 5 pieces to optimize welding schedules and material procurement.
Yes. Our engineering team can modify the arch curvature and flange dimensions to accommodate widths from 300 mm up to 800 mm, ensuring a perfect fit for bespoke boiler designs.
Standard steel grades are delivered within 15‑30 days. Specialized alloys or large‑size arches may require 30‑45 days, depending on material availability.
All units ship with a 12‑month warranty covering material defects and welding integrity, provided installation follows our recommended procedures.
Ready to upgrade your boiler’s reliability and efficiency? Our technical sales engineers are standing by to discuss load calculations, material options, and delivery schedules. Email us today or call +1‑800‑555‑0123 for a no‑obligation quotation.