Our scada system for coal fired power plant boiler delivers real‑time monitoring, automated control, and predictive analytics for large‑scale boiler installations. Designed for 300 MW‑plus units, the platform integrates with PLCs, DCS, and field instrumentation to provide a single, secure interface for operators and maintenance teams. The solution reduces fuel consumption, extends equipment life, and ensures compliance with environmental regulations without compromising plant availability.
Engineered in accordance with IEC 61850 and ISO 50001, the system is modular, allowing phased roll‑outs or full‑scale deployment. Whether you are upgrading an existing boiler or commissioning a new plant, the SCADA package can be tailored to match your network topology, redundancy requirements, and cybersecurity policies.
The platform gathers data from over 5,000 analog and digital points—temperature, pressure, flow, and emissions—using high‑speed OPC‑UA gateways. Data is normalized, time‑stamped, and stored in a redundant historian for 10‑year retention. Operators view trends on customizable dashboards, while the embedded logic executes set‑point adjustments in milliseconds to maintain optimal combustion efficiency.
Advanced analytics apply machine‑learning models to detect early signs of tube fouling, burner misfire, or feed‑water pump wear. When a deviation exceeds defined thresholds, the system triggers an alarm, logs the event, and can automatically switch to a pre‑validated fallback strategy, keeping the boiler in safe operation while technicians are dispatched.
| Parameter | Standard Range | Custom Options |
|---|---|---|
| Supported Boiler Capacity | 150 MW – 800 MW | Scalable to >1 GW |
| Data Refresh Rate | ≤ 500 ms (critical loops) | Sub‑100 ms with edge compute |
| Redundancy Level | N+1 | 2N, 2N+1 hot‑standby |
| Communications Protocols | OPC‑UA, Modbus TCP, DNP3 | IEC 61850, PROFINET, Ethernet/IP |
| Cybersecurity | AES‑256, role‑based access | ISO 27001‑aligned, IDS/IPS integration |
All specifications are adjustable during engineering workshops to match plant‑specific requirements, including voltage levels, rack dimensions, and interface libraries.
We work on a project‑by‑project basis; there is no fixed MOQ. Small‑scale retrofits for 150 MW boilers can be delivered alongside larger 800 MW deployments in the same contract window.
Yes. Our engineering team creates protocol adapters for existing DCS, PLC, and historian platforms, ensuring seamless data exchange without replacing proven field equipment.
Standard lead time is 15‑45 days for software licensing and hardware kits, plus 30‑60 days for on‑site integration and validation, depending on site readiness and customization depth.
All units ship with a 24‑month comprehensive warranty covering parts, firmware updates, and remote troubleshooting. Extended service contracts (up to 5 years) include on‑site preventive maintenance and priority response.