Our scr scrubbing system upgrade for industrial coal boiler is engineered to retrofit existing coal‑fired units with state‑of‑the‑art flue‑gas cleaning technology. The modular kit replaces legacy wet‑scrubbers, delivering superior SO₂ and NOx removal while extending boiler life‑cycle. Designed for plants from 50 MW to 500 MW, the system integrates seamlessly with current control panels and can be commissioned within a single shutdown window.
By upgrading, operators achieve compliance with the latest EU‑ETS, US EPA, and Chinese emission standards without the capital expense of a full boiler replacement. The solution is supplied as a complete package: pre‑fabricated absorber towers, high‑efficiency catalyst modules, automated reagent dosing, and a PLC‑based monitoring interface.
The upgrade employs a two‑stage scrubbing approach. First, a limestone‑based wet absorber neutralizes sulfur oxides, producing a stable calcium sulfite slurry. The slurry is then pumped to a high‑temperature catalyst chamber where selective catalytic reduction (SCR) converts residual NOx into nitrogen and water using a urea‑based reagent. Real‑time sensors adjust reagent flow to match load variations, ensuring optimal removal rates across the full duty cycle.
The system’s closed‑loop design recirculates treated water, reducing fresh water consumption by up to 40 % compared with conventional scrubbers. Heat exchangers recover waste heat from the flue gas, feeding it back to the boiler feedwater system and improving overall plant thermal efficiency by 1‑2 percentage points.
| Parameter | Typical Range | Unit |
|---|---|---|
| Design Capacity (Steam) | 50 – 500 | MW |
| SO₂ Removal Efficiency | 95 – 99 | % |
| NOx Reduction (SCR) | 90 – 95 | % |
| Reagent Consumption (Urea) | 5 – 8 | kg/MWh |
| Water Re‑use Rate | 60 – 80 | % |
| Operating Temperature (Absorber) | 120 – 150 | °C |
| Control Interface | PLC with HMI | – |
*Typical specifications are customizable per order to match specific boiler designs and local regulatory limits.
The standard MOQ is one full‑scale boiler package, typically covering a 100 MW unit. Smaller pilot kits (10 MW equivalent) are available for demonstration or phased implementation projects.
Yes. Our engineering team works with plant OEMs to integrate the scr scrubbing system upgrade for industrial coal boiler into DCS, PLC, or SCADA environments, offering both analog and digital I/O options.
Standard projects ship within 15‑45 days after final engineering sign‑off, depending on component availability and required certifications.
All units carry a 24‑month full‑parts warranty and a 36‑month extended warranty on the catalyst. Our global service team offers routine maintenance contracts and emergency response within 48 hours of a service call.