When a plant needs reliable, high‑capacity steam on a compact footprint, a skid mounted coal fired steam boiler is the answer. As a dedicated skid mounted coal fired steam boiler supplier, we deliver turn‑key units that integrate seamlessly with existing process lines, reduce on‑site erection time, and meet the stringent efficiency standards demanded by modern industry.
Our boilers are engineered for continuous‑duty operation in power generation, petrochemical refining, pulp & paper, and heavy‑industry processes. The skid‑mounted design eliminates the need for a permanent foundation, allowing rapid relocation or expansion as plant requirements evolve. Each unit is factory‑tested, comes with comprehensive documentation, and is supported by a global service network.
| Parameter | Typical Range | Unit |
|---|---|---|
| Steam Generation Capacity | 5 – 250 | t/h |
| Design Pressure | 10 – 25 | bar |
| Design Temperature | 180 – 350 | °C |
| Fuel Flexibility | Bituminous, Sub‑bituminous, Lignite | – |
| Overall Thermal Efficiency | 78 % – 85 % | – |
| Water‑Treatment System | Inline deaerator, softening package | – |
| Dimensions (L × W × H) | 4.5 – 12 m × 2.0 – 4.5 m × 3.0 – 5.5 m | – |
| Weight (incl. skid) | 12 – 85 | tonnes |
All of our skid‑mounted boilers are manufactured in facilities audited to ISO 9001 for quality management and ISO 14001 for environmental stewardship. The pressure vessels conform to the ASME Section I code, and each unit undergoes third‑party hydrostatic testing before shipment. Safety valves, emergency shut‑down controls, and integrated flame‑monitoring sensors are supplied as standard equipment, ensuring compliance with local occupational safety regulations.
We accept single‑unit orders; the design is fully customizable regardless of volume. Larger projects benefit from volume discounts on ancillary equipment such as feedwater pumps and control panels.
Yes. Our combustion system can be tuned for low‑sulfur bituminous coal, sub‑bituminous blends, or a mixture of coal and biomass. Fuel‑flexibility options are discussed during the engineering phase.
Standard lead time is 15‑45 days, depending on capacity, optional accessories, and certification requirements. Expedited schedules are available for an additional fee.
All units carry a 24‑month warranty covering materials and workmanship. Our technical service team offers on‑site commissioning, routine maintenance contracts, and spare‑parts logistics worldwide.
Contact our engineering sales desk today to discuss capacity, layout, and regulatory requirements. A single email or phone call starts the design‑verification process and puts you on the path to reliable, cost‑effective steam generation.