Power‑generation plants, cement factories, and large‑scale petrochemical complexes rely on reliable steam generation. Our steam drum for industrial water tube coal boiler is engineered to handle the high‑temperature, high‑pressure environments typical of these facilities. Whether you are upgrading an existing unit or outfitting a new plant, the drum delivers consistent steam separation and water‑level control, minimizing downtime and supporting continuous operation.
Our steam drum for industrial water tube coal boiler is a pressure‑rated vessel that collects steam from the boiler’s water‑tube array, separates moisture, and provides a stable water‑level buffer for safe operation. Constructed from high‑grade carbon steel with austenitic stainless‑steel lining where required, the drum meets the rigorous demands of coal‑fired systems, including resistance to scale, corrosion, and thermal fatigue.
The design incorporates a horizontal cylindrical shell, a reinforced crown, and integrated internal baffles that promote efficient steam‑water separation. Standard models are supplied with a removable inspection hatch, pressure‑rated manways, and provision for level transmitters or sight glasses.
| Parameter | Range / Options | Unit |
|---|---|---|
| Design Pressure | 1.6 – 3.5 | MPa |
| Design Temperature | 250 – 350 | °C |
| Diameter (overall) | 1.0 – 3.5 | m |
| Water‑Level Capacity | 5 – 80 | m³ |
| Material (Shell) | SA-516 Grade 70 carbon steel | — |
| Internal Lining (optional) | Austenitic SS 304/316 | — |
| Certification | ASME Section I, EN 13445 | — |
What sets our steam drum apart from generic offerings?
We accept single‑unit orders for prototype or pilot projects. For volume production, MOQ typically starts at 3 units, but we can discuss flexible arrangements based on your schedule.
Yes. Our engineering team can integrate extra nozzle openings, manways, and instrumentation ports to match your P&ID requirements. All additions are validated during the pressure‑test phase.
Standard dimensions and material selections are produced within 15‑45 days after receipt of a purchase order and required engineering data.
All drums are covered by a 12‑month warranty against material and workmanship defects. Our technical support team is available for installation guidance, performance verification, and spare‑part sourcing throughout the warranty period.
Ready to integrate a reliable steam drum into your coal‑fired boiler system?
Contact Our Engineering Team Today