Industrial plants that require low‑carbon steam generation are turning to hydrogen as a clean‑fuel supplement. Our certified hydrogen conversion burner is engineered for retro‑fitting existing oil‑ or gas‑fired steam boilers in petrochemical complexes, pulp‑and‑paper mills, food‑processing facilities, and power‑generation stations. The unit delivers reliable flame stability when operating with hydrogen blends from 5 % up to 30 % by volume, making it suitable for continuous‑duty (up to 8 000 h/yr) and peak‑load applications where emissions limits are stringent.
The certified hydrogen conversion burner for steam boilers is a modular, plug‑and‑play solution that replaces the primary fuel nozzle of standard burners. Constructed from high‑temperature alloyed steel and equipped with a precision‑machined swirl chamber, the burner maintains optimal flame front positioning even as the hydrogen content varies. Integrated diagnostics communicate via Modbus TCP, allowing plant engineers to monitor flame quality, fuel flow, and emissions in real time.
| Parameter | Typical Range | Units |
|---|---|---|
| Design Capacity (steam output) | 5 – 150 | ton/h |
| Operating Pressure | 10 – 30 | bar |
| Hydrogen Blend Ratio | 5 % – 30 % | % vol. |
| NOx Emissions (max) | ≤ 30 | mg/MJ |
| Material Construction | Inconel 718 / 316 SS | ‑ |
| Dimensions (L×W×H) | 400 × 300 × 250 | mm |
| Weight (incl. accessories) | 120 – 350 | kg |
| Control Interface | Modbus TCP / Analog 4‑20 mA | ‑ |
All values are indicative; each burner is customized to match the specific boiler geometry, fuel supply, and emission targets of the project.
Our hydrogen conversion burner carries the following internationally recognised approvals:
The unit incorporates multiple safety interlocks: flame‑out detection, hydrogen‑rich‑mix shutdown, and over‑temperature protection. Installation and commissioning are performed by factory‑trained engineers who follow a documented safety‑critical procedure, ensuring that the retrofit meets both local regulations and corporate ESG commitments.
We typically start production at a single unit for pilot projects, but bulk pricing tiers begin at 5 units. All orders are built to the buyer’s specification, so MOQ is driven by engineering effort rather than volume.
Yes. The integrated fuel‑mix controller allows the proportion of hydrogen to be changed in 1 % increments while the boiler is operating, with automatic recalibration of the flame‑stability algorithm.
Standard lead time is 15–45 days, depending on the complexity of the retrofit layout and the availability of required certifications. Expedited schedules are possible with a confirmed purchase order and a 30 % deposit.
All burners carry a 24‑month limited warranty covering manufacturing defects and material failures. We also offer a 3‑year optional service contract that includes annual performance audits, remote diagnostics, and on‑site spare‑part replacement.
Ready to reduce carbon intensity and meet stricter emission standards? Contact our sales team today for a technical quote, engineering assistance, or to schedule a feasibility study.