Procurement managers and system integrators in the chemical, petro‑chemical, refinery, and fuel‑cell sectors constantly seek compact, turn‑key steam generators that can be deployed quickly and operate reliably under harsh conditions. A containerized hydrogen steam generator wholesale offering delivers a complete, pre‑tested unit that fits into a standard 20‑ft or 40‑ft ISO container, enabling rapid site installation for:
Because the equipment is delivered as a sealed container, utilities (water, electricity, and gas) can be hooked up on‑site within a single work shift, minimizing engineering overhead and permitting a fast return on investment.
Our containerized hydrogen steam generator is engineered for continuous operation with a flexible duty cycle ranging from 30 % up to 100 % load. The modular design incorporates a high‑efficiency furnace, a stainless‑steel steam‑generation coil, and an integrated control cabinet that meets IEC 61511 safety‑instrumented system requirements. The unit is pre‑wired for 380 V three‑phase power, includes built‑in remote monitoring (Modbus/TCP), and complies with CE, ISO 9001, and ATEX certification for hazardous environments.
When you source containerized hydrogen steam generator wholesale, you receive a fully insulated, weather‑proof container that can be transported by road, rail, or sea without disassembly. This reduces handling risk and guarantees that the performance data achieved in the factory is reproduced at the installation site.
| Parameter | Standard Range | Optional Upgrade |
|---|---|---|
| Steam Production Capacity | 5 – 30 kg/h (per container) | Up to 50 kg/h (dual‑furnace option) |
| Operating Pressure | 0.5 – 3 bar(g) | Up to 10 bar(g) with reinforced coil |
| Steam Temperature | 150 °C – 260 °C | Up to 350 °C (high‑temp alloy) |
| Electrical Power Consumption | 30 kW – 120 kW | Variable frequency drive for energy saving |
| Duty Cycle | 30 % – 100 % | Continuous 24/7 with redundant burners |
| Container Size | 20‑ft ISO (standard) or 40‑ft ISO | Custom internal layout for dual units |
| Certifications | CE, ISO 9001, ATEX II 1G | UL, IEC 61508 optional |
All data points are adjustable during the engineering phase to match the specific steam demand, pressure profile, and site utilities of your project.
We work with both distributors and end‑users; the typical MOQ is one container unit, which allows you to evaluate performance before scaling up. Larger projects can benefit from volume discounts and synchronized delivery.
Absolutely. During the engineering phase we adjust furnace sizing, coil material, and control logic to meet any pressure up to 10 bar(g) and temperature up to 350 °C, as reflected in the “Optional Upgrade” column of the specification table.
Standard configurations are shipped within 15–45 days after order confirmation and receipt of a down‑payment. Fully bespoke designs may require 60–90 days, depending on engineering complexity and certification requirements.
All units come with a 12‑month comprehensive warranty covering parts and labor. Extended warranty options up to 36 months are available, along with on‑site commissioning, operator training, and a 24/7 technical hotline.
Ready to integrate a reliable steam source into your hydrogen production line? Contact our sales team today for a quotation and detailed technical package.