Our high‑efficiency hydrogen boiler platform is engineered for **decarbonizing industrial manufacturing with hydrogen boilers** as a core strategy. The system delivers clean, high‑temperature steam or hot water to metal‑working, chemicals, glass, and cement plants while eliminating the carbon footprint associated with fossil‑fuel burners. Designed for modular integration, the boiler can be sized from 2 MW to 30 MW thermal output, allowing a seamless retrofit or a purpose‑built new‑build installation.
The unit operates on a closed‑loop hydrogen combustion cycle. Hydrogen is supplied via high‑pressure storage or on‑site electrolysis, mixed with ambient air in a pre‑mix chamber, and ignited in a low‑NOx burner. A stainless‑steel heat‑exchange matrix extracts up to 98 % of the combustion energy, producing saturated or superheated steam at pressures up to 30 bar. Integrated exhaust treatment captures residual NOx, guaranteeing compliance with the most stringent emission regulations.
Key process steps include:
All parameters are configurable to match the specific duty cycle, pressure, and space constraints of your facility.
| Parameter | Typical Range | Units |
|---|---|---|
| Thermal Output | 2 – 30 | MW |
| Steam Pressure (max) | 10 – 30 | bar |
| Overall Efficiency | 95 – 98 | % (LHV) |
| Hydrogen Consumption | 0.04 – 0.12 | kg/MWh |
| Duty Cycle | Continuous (24/7) or Intermittent (up to 30 % load) | – |
| Control Interface | Proprietary HMI, OPC‑UA, Modbus TCP | – |
The hydrogen boiler platform has been deployed across a spectrum of high‑temperature processes where carbon intensity is a critical barrier:
We work on a project‑by‑project basis; there is no strict MOQ. A single 2 MW unit can be supplied for pilot installations, while larger plants can order multiple modules for a phased rollout.
Our modular chassis and adjustable mounting kits allow integration into spaces as tight as 1.8 m width. Detailed 3‑D CAD models are provided during the engineering phase to verify fit‑up before fabrication.
Typical lead time ranges from 15 days for standard 2‑5 MW modules to 45 days for bespoke configurations exceeding 20 MW, depending on component availability and certification requirements.
All units are backed by a 24‑month comprehensive warranty covering manufacturing defects, burner performance, and control‑system software. Extended service contracts are available upon request.
Ready to transition to zero‑carbon process heat? Contact our engineering team today.
Request a Quote