In hydrogen‑fueled boiler systems, maintaining airtight isolation and rapid depressurisation is critical for safety and efficiency. Our double block and bleed valve for hydrogen boiler delivers precise shut‑off, reliable venting, and compliance with the strictest industrial standards, making it the preferred choice for OEMs and plant integrators worldwide.
The valve is engineered for high‑pressure hydrogen loops in power‑generation boilers, waste‑heat recovery units, and large‑scale district heating plants. It excels in:
Our double block and bleed valve combines two independent shut‑off discs with a central bleed port, offering dual isolation plus a controlled vent path. Constructed from 316L stainless steel and equipped with metal‑sealed seating, the valve withstands hydrogen embrittlement and provides a leak rate well below 10⁻⁹ m³/s, meeting the demands of modern hydrogen boiler plants.
| Parameter | Range / Options |
|---|---|
| Connection Size (DN) | DN15 – DN200 (flanged) |
| Design Pressure | 1.6 MPa – 16 MPa (PN16 – PN160) |
| Operating Temperature | ‑40 °C to +250 °C |
| Leak Rate (Hydrogen) | ≤ 1 × 10⁻⁹ m³/s (per IEC 61511) |
| Actuation | Manual / Pneumatic (5‑15 bar) / Electric (24 VDC) |
| Materials | Body: 316L SS; Seats: PTFE‑Lined; Seals: EPDM / Viton |
| Certifications | ISO 9001, ISO 14001, CE, ASME BPVC Section III |
*All dimensions and pressure classes can be adapted to project‑specific drawings.*
1. First Block Closed: The upstream disc seals the inlet, preventing forward flow.
2. Bleed Port Opened: The central vent releases any trapped hydrogen pressure to a safe vent line.
3. Second Block Closed: The downstream disc seals the outlet, completing full isolation.
This sequence can be automated, allowing a control system to execute a “shutdown‑and‑vent” routine in less than 2 seconds, a crucial metric for hydrogen boiler safety loops.
The valve complies with the most rigorous standards governing hydrogen service:
Our standard MOQ is 10 units per valve size. For larger projects we can accommodate batch orders of 50 + units with tiered pricing.
Yes. We offer engineering support to modify flange dimensions, pressure classes, or actuation methods to match your OEM drawings.
Standard configurations ship within 15–30 days after order confirmation. Customized designs require 45–60 days, depending on complexity.
All valves carry a 24‑month warranty against material defects and workmanship, backed by our technical support team.
Ready to secure your hydrogen boiler system with a proven double block and bleed solution?
Contact Our Engineering Team Today