Our green hydrogen utility boiler for power plant delivers reliable steam generation while eliminating carbon emissions. Engineered for large‑scale power generation sites, the boiler integrates seamlessly with existing hydrogen infrastructure and supports continuous‑duty operation up to 8,000 hours per year. Designed for OEMs, EPC contractors, and utility managers, it meets the stringent performance and safety requirements of modern energy‑transition projects.
By converting renewable‑derived hydrogen into high‑temperature steam, the system provides a flexible, on‑demand heat source for turbines, feed‑water heating, and ancillary processes. Its modular design allows capacity scaling from 20 MWth to 150 MWth, ensuring a perfect fit for both new builds and retrofits.
| Parameter | Typical Range | Unit | Notes |
|---|---|---|---|
| Steam Capacity | 20 – 150 | MWth | Modular, stackable units |
| Design Pressure | 10 – 25 | Bar(g) | Compliant with EN 12952‑2 |
| Operating Temperature | 500 – 850 | °C | Optimized for high‑efficiency cycles |
| Hydrogen Flow Rate | 30 – 250 | kg/h | Based on 99.99 % purity |
| Efficiency (HHV) | ≥ 92 | % | Measured at full load |
| Duty Cycle | Continuous | — | Up to 8,000 hrs/yr |
| Warranty | 24 | months | Standard, extendable on request |
All parameters are adjustable during the engineering phase to match site‑specific steam demand, pressure ratings, and integration constraints.
The green hydrogen utility boiler for power plant is ideal for:
By supplying clean steam directly from hydrogen, operators achieve compliance with tightening emissions regulations while maintaining operational flexibility.
We accept single‑unit orders for pilot projects, but standard production runs start at a MOQ of 3 units to optimize manufacturing efficiency.
Yes. The combustion chamber can be configured for dual‑fuel mode, allowing a smooth transition from natural‑gas to 100 % green hydrogen without hardware replacement.
Typical lead time is 15‑45 days, depending on capacity and any special material requests. Expedited schedules are available upon agreement.
All units ship with a 24‑month warranty covering material and workmanship. Our global service network provides on‑site commissioning, training, and 24/7 technical assistance throughout the warranty period.
Ready to future‑proof your power plant with zero‑carbon steam? Contact our engineering team today for a detailed quotation, system layout, and integration roadmap.