Our hydrogen blending system for commercial boilers is a turnkey solution that enables existing gas‑fired boiler plants to introduce hydrogen into their fuel mix without costly retrofits. Designed for mid‑size to large‑capacity installations, the unit delivers precise hydrogen‑to‑natural‑gas ratios, reduces carbon intensity, and maintains the thermal performance required by industrial procurement managers and plant engineers.
The system combines three core modules: a high‑accuracy mass flow controller, an on‑board safety‑interlock PLC, and a modular mixer manifold. Fuel gas enters the flow controller where the desired hydrogen percentage (typically 5‑30 %) is set via an intuitive HMI. The controller modulates the hydrogen feed line, which is stored in a low‑pressure vessel, and blends it with the main gas line in real time. Continuous monitoring of pressure, temperature, and composition ensures the mixed fuel stays within the boiler’s design envelope, while automatic shutdown triggers protect against over‑pressure or composition excursions.
| Parameter | Range | Standard |
|---|---|---|
| Maximum Boiler Capacity | 5 MW – 50 MW (thermal) | ASME PTC 19.3 |
| Hydrogen Blend Ratio | 5 % – 30 % (by volume) | ISO 21087 |
| Flow‑Control Accuracy | ±0.5 % of setpoint | IEC 61508 Level 2 |
| Operating Pressure | 0.1 – 5 bar (gauge) | EN 16110 |
| Temperature Range | ‑20 °C – +60 °C | IEC 60079‑10‑1 |
| Control Interface | 10‑inch Touchscreen HMI, Modbus/TCP, Profibus | IEC 61850 |
| Warranty | 24 months parts & labor | Standard |
Our standard catalogue units start at a 1‑unit MOQ. For project‑specific configurations—such as unique manifold dimensions or bespoke communication protocols—the MOQ can be negotiated as low as a single prototype unit.
Yes. The integrated PLC continuously reads the hydrogen tank pressure and automatically recalibrates the mass flow setpoint, allowing real‑time ratio changes from 5 % up to the maximum certified level without manual intervention.
Standard models ship within 15‑30 days after purchase order receipt. Fully customized solutions, which may involve bespoke housing or additional safety certifications, generally require 30‑45 days.
All units carry a 24‑month warranty covering parts and labor. Our technical support team is available 24 × 7 for remote diagnostics, and we offer on‑site service contracts for critical installations.
Integrating a hydrogen blending system for commercial boilers is the most cost‑effective pathway to lower emissions while protecting existing capital assets. Contact our engineering team today to discuss capacity, customization options, and a quotation tailored to your project timeline.