Industrial plants and power‑generation facilities are under increasing pressure to lower fuel costs while meeting stricter environmental regulations. Our hydrogen enrichment system for gas fired boilers injects a precisely‑controlled blend of hydrogen into the combustion chamber, raising flame temperature and improving heat transfer without major hardware changes. The result is a measurable increase in boiler efficiency, reduced natural‑gas consumption, and lower CO₂ output—key metrics for any procurement manager focused on ROI and compliance.
Hydrogen has a higher flame speed and a wider flammability range than methane. Our system draws hydrogen from on‑site electrolyzers or bulk suppliers, compresses it to 30‑50 bar, and meters it into the boiler’s primary fuel line via a pulse‑width‑modulated injector. An integrated sensor suite monitors O₂, CO, and flame temperature, feeding a closed‑loop controller that continuously optimises the H₂/CH₄ ratio (typically 5‑15%). Because the combustion chemistry shifts toward a cleaner, hotter flame, heat transfer to the boiler water‑wall improves, and excess air is reduced, directly cutting fuel consumption.
The flexibility of our enrichment unit makes it suitable for a range of installations:
| Parameter | Range / Options | Typical Value |
|---|---|---|
| Hydrogen Flow Rate | 0.5‑5 Nm³/h | 2 Nm³/h |
| Maximum Boiler Capacity | 5‑120 MW | 30 MW |
| Operating Pressure | 30‑50 bar (hydrogen) | 40 bar |
| Control Interface | Modbus TCP, Profibus, HART | Modbus TCP |
| Warranty | 12‑24 months | 24 months |
*Values are indicative; final specifications are defined during engineering consultation.
We typically start projects at a single unit, allowing pilots or single‑boiler upgrades. Volume discounts apply from 5 units onward.
Yes. The modular injector and piping are designed for quick‑changeover. Most installations are completed within two to three maintenance windows, totaling less than 48 hours of downtime.
Standard lead time is 15‑45 days, depending on configuration complexity and hydrogen supply logistics. Expedited engineering can reduce this to 10 days.
All units meet IEC 61508 functional safety, ATEX Zone 1 certification, and are tested to ISO 9001 quality standards. Documentation is provided for regulatory submission.