The shift to clean‑energy hydrogen demands reliable, real‑time visibility of every steam‑generation node. Our remote SCADA monitoring for hydrogen steam networks delivers a unified, secure dashboard that aggregates pressure, temperature, flow, and safety‑interlock data from dispersed generators to a central control centre. Designed for plant engineers, procurement specialists, and system integrators, the solution ensures continuous compliance, rapid fault isolation, and optimal efficiency across the entire hydrogen‑steam infrastructure.
• Large‑scale electrolyzer complexes where steam reformers are co‑located with PEM cells.
• Industrial hydrogen refueling stations that require on‑site steam for fuel‑cell warming.
• Power‑to‑gas plants integrating waste‑heat recovery steam loops with hydrogen synthesis.
• Research & development facilities needing precise, logged data for process validation.
Our platform combines rugged field‑gate units with a cloud‑native SCADA core. Each gate unit communicates via IEC 60870‑5‑104, OPC UA, or secure MQTT, delivering encrypted telemetry to a web‑based HMI that supports multi‑site overview, alarm management, and trend analysis. The architecture is modular: add or remove nodes without downtime, and scale from a single pilot loop to a continent‑spanning network.
1. Sensor Integration – Temperature, pressure, flow, and safety‑switch transducers connect to the field‑gate via DIN‑rail terminals.
2. Edge Processing – The gate’s industrial‑grade PLC validates data, applies configurable dead‑band filters, and logs events locally (up to 30 days).
3. Secure Transmission – Data packets are signed and encrypted (TLS 1.3) before being sent over VPN or cellular/LTE‑M networks.
4. Central SCADA Engine – The cloud service aggregates streams, runs analytics (efficiency curves, predictive maintenance), and pushes alerts to SMS, email, or third‑party EWS systems.
5. Operator Interface – Users access customizable dashboards on PC or tablet; role‑based access controls restrict configuration rights.
| Parameter | Standard Range | Optional Enhancements |
|---|---|---|
| Operating Temperature (gate) | ‑20 °C to +60 °C | Extended‑range –40 °C to +85 °C |
| Communications | Ethernet 10/100 Mbps, IEC 60870‑5‑104, OPC UA | Cellular/LTE‑M, 5G, Redundant Ethernet |
| Power Supply | 24 V DC ±10 % | Battery backup (up to 48 h), Solar‑assist |
| Data Retention (edge) | 30 days, 1 min granularity | Custom archive intervals, 5 years cloud storage |
| Certifications | CE, IEC 60529 IP‑65 | ATEX Zone 1/2, IECEx, UL 508C |
We can ship a single field‑gate unit for pilot testing. Full‑system packages (gate + cloud license) start at 5 units, but volume discounts apply from 20 units onward.
Yes. Our hardware can be supplied with ATEX Zone 1/2 or IECEx certification on request, and firmware can be locked to meet client‑defined safety integrity levels.
Standard configurations ship within 15‑30 days after purchase order confirmation. Custom‑certified or high‑volume orders require 30‑45 days, with expedited options available for an additional fee.
All units include a 24‑month limited warranty covering parts and firmware updates. Optional extended warranty (up to 5 years) and on‑site maintenance contracts are available.