When a hydrogen‑fuel system demands instant isolation, the safety shut off valve for hydrogen gas line delivers decisive protection. Engineered for refueling stations, industrial electrolyzers, and transport pipelines, this valve provides rapid, leak‑tight closure to safeguard personnel, equipment, and the environment. Its design meets the stringent demands of hydrogen service, including high pressure, low temperature, and strict safety regulations.
The valve employs a spring‑loaded pop‑petal actuator that trips automatically when a preset pressure differential is exceeded or when an external safety signal is received. The pop‑petal opens fully, exposing a metal‑to‑metal seal that guarantees zero leakage even under 10 MPa (1450 psi). Manual override is available via a robust handwheel for maintenance or emergency shutdown, ensuring complete control in any scenario.
| Parameter | Typical Range | Notes |
|---|---|---|
| Size (DN) | 15 mm – 200 mm | Custom bore sizes available on request |
| Maximum Working Pressure | 10 MPa (1450 psi) | ISO 16533 compliant |
| Operating Temperature | ‑50 °C to +150 °C | Suitable for cryogenic and elevated‑temperature hydrogen |
| Material | 316L stainless steel, Hastelloy C‑276 | Corrosion‑resistant alloys for aggressive environments |
| Connection Type | Flanged (ANSI B16.5), Threaded (ISO 7‑1) | Adaptable to existing piping standards |
| Actuation | Spring‑loaded pop‑petal, manual handwheel | Fast response (< 0.2 s) plus manual control |
Our valve is manufactured in ISO‑9001 facilities and conforms to the following standards:
Each unit undergoes hydrostatic testing, leak testing with helium, and a full functional verification before shipment, ensuring that you receive a valve ready for immediate integration.
We accept single‑unit orders for prototyping. For production runs, the typical MOQ is 20 units, but we can adjust based on material selection and tooling requirements.
Yes. Our engineering team can redesign the seal geometry and spring preload to meet pressures up to 20 MPa, subject to additional testing and certification.
Standard models ship within 15‑30 days after order confirmation. Fully customized designs require 30‑45 days, depending on material availability and certification scope.
All valves carry a 24‑month warranty covering material defects and manufacturing errors. Our technical support team is available 24 h/7 d for troubleshooting, spare‑part sourcing, and on‑site assistance.
The safety shut off valve for hydrogen gas line combines proven reliability, full certification, and flexible engineering to protect your assets and meet regulatory demands. Reach out today to discuss specifications, request a quotation, or arrange a virtual product demonstration.