Our water treatment plant for hydrogen boiler system delivers ultra‑pure, corrosion‑free feed water that meets the stringent demands of modern hydrogen‑fired boilers. Designed for continuous operation in power generation, petrochemical, and industrial heating facilities, the solution integrates advanced pretreatment, demineralization, and polishing stages into a compact, modular package. The result is a steady supply of water with total dissolved solids (TDS) below 1 ppm, oxygen content under 5 ppb, and a pH tightly controlled between 6.8 and 7.2, ensuring optimal boiler efficiency and extended equipment life.
Engineered to match the high‑temperature, high‑pressure environment of hydrogen combustion, the plant incorporates stainless‑steel (316L) and titanium contact surfaces, low‑leakage fittings, and automated control logic that integrates seamlessly with SCADA or DCS platforms.
The plant is suited for a range of installations where hydrogen is used as the primary fuel or as a supplemental burner:
In each case, the system can be configured for batch or continuous operation, with duty cycles ranging from 60 % to 100 % depending on load profile.
| Parameter | Typical Range | Unit |
|---|---|---|
| Design Flow Rate | 10 – 200 | m³/h |
| Outlet Conductivity | ≤ 0.5 | µS/cm |
| Total Dissolved Solids (TDS) | ≤ 1 | ppm |
| Oxygen Content | ≤ 5 | ppb |
| Operating Pressure | 1 – 10 | bar |
| Control Interface | Modbus‑TCP / Ethernet/IP | – |
| Warranty | 24 months | – |
All values are indicative; engineering teams will tailor the plant to match your specific feed‑water composition, boiler pressure, and operational schedule.
We accept projects starting from a single 10 m³/h unit. Larger capacities are built by linking multiple modules, allowing you to scale from a pilot plant to a full‑scale commercial installation without redesign.
Yes. The control system supports Modbus‑TCP, Ethernet/IP, and OPC‑UA protocols. Firmware can be configured to map directly to your plant’s tag database, providing real‑time water quality metrics alongside boiler performance data.
Standard lead time is 30‑45 days for the base package. Projects requiring special alloy components, extensive instrumentation, or on‑site factory acceptance testing may extend to 60 days. Our engineering team will provide a detailed schedule with milestones.
All installations come with a 24‑month comprehensive warranty covering parts, workmanship, and control software. We also offer optional extended service contracts, spare‑part logistics, and on‑site commissioning assistance.