When you specify a field erected utility scale marine boiler for offshore platforms or coastal power stations, you need more than just capacity – you need proven reliability, regulatory compliance, and a partner that can adapt the unit to harsh marine environments. Our engineering team leverages decades of ship‑yard experience to deliver boilers that stay online through corrosive salt spray, temperature extremes, and variable load cycles, all while meeting the strictest classification society standards.
Our field erected utility scale marine boiler is a high‑efficiency, water‑tube unit engineered for permanent installation on offshore rigs, floating production storage and offloading (FPSO) vessels, and coastal power generation sites. The boiler is fabricated in sections that are lifted and bolted together on‑site, eliminating the need for large‑scale transportation containers. It operates on heavy fuel oil, marine diesel, or low‑sulfur alternatives, delivering saturated or superheated steam to drive turbines, process heat exchangers, or auxiliary systems.
Each boiler meets international marine environmental regulations (MARPOL Annex VI) and is certified by classification societies such as DNV GL and Lloyd’s Register. The design incorporates corrosion‑resistant alloys, insulated pipework, and a redundancy‑focused feedwater system to guarantee uptime of 95 %+ during a typical 24‑month maintenance cycle.
| Parameter | Range | Unit |
|---|---|---|
| Steam Output | 5 – 30 | MW |
| Operating Pressure | 30 – 80 | bar |
| Fuel Types | HFO, MDO, LNG (optional) | – |
| Thermal Efficiency | 85 – 92 | % (net) |
| Weight (erected) | 150 – 650 | tonnes |
| Module Length | 2.5 – 6.0 | m |
| Lead Time | 15 – 45 | days (post‑order) |
All dimensions, pressure ratings, and fuel options are configurable to match your project’s engineering envelope. Our engineering office works directly with ship‑yard designers to produce CAD models that align with your erection plan.
We accept single‑unit orders for projects of any size. The MOQ is driven by engineering effort rather than volume, so a one‑off installation can be fully supported with the same design rigor as a multi‑unit contract.
Yes. Our standard design accommodates heavy fuel oil or marine diesel, and an optional LNG conversion kit can be integrated during the engineering phase, including fuel‑gas handling, vaporizer, and safety interlocks.
All units ship with a 24‑month comprehensive warranty covering material defects and manufacturing workmanship. During warranty, we provide on‑site technical assistance, spare‑part logistics, and remote monitoring at no extra cost.
Typical lead time is 15‑45 days for fabrication, followed by a 5‑10 day on‑site assembly window, depending on site accessibility and weather windows. Detailed schedule planning is coordinated with your project manager to align with vessel mobilization.
Ready to integrate a proven field erected utility scale marine boiler into your next offshore power solution?
Request a Quote Today