Operators of capsize bulk carriers demand a reliable source of steam for cargo heating, tank washing, and auxiliary engine pre‑heat. A marine auxiliary boiler for capsize bulk carrier delivers the necessary thermal energy while withstanding the harsh marine environment and the vessel’s unique stability profile. Whether the ship is loading temperature‑sensitive grain, de‑icing deck equipment, or maintaining habitability systems during long transits, the auxiliary boiler is engineered to operate continuously at 70‑85% duty cycle without compromising the vessel’s trim or ballast arrangement.
Our marine auxiliary boiler is a compact, water‑tube design specifically calibrated for the limited space and weight distribution challenges of capsize bulk carriers. Constructed from corrosion‑resistant stainless steel and equipped with a low‑profile furnace, the unit integrates seamlessly into existing engine rooms, providing up to 1,500 kW of steam output at 10‑12 bar pressure. The boiler features automatic fuel‑air balancing, remote monitoring via NMEA‑compatible interfaces, and a fast‑start cycle that reaches full load in under five minutes—critical for vessels that must respond quickly to cargo temperature requirements.
| Parameter | Standard Range | Optional Enhancements |
|---|---|---|
| Steam Generation Capacity | 1,200 – 1,500 kW | Up to 2,000 kW (custom turbine‑driven feed) |
| Operating Pressure | 10 – 12 bar | 15 bar (high‑temperature cargo) |
| Fuel Types | Heavy fuel oil, marine diesel | Dual‑fuel (LNG compatible) |
| Dimensions (L × W × H) | 2.8 m × 1.5 m × 1.6 m | Custom envelope (space‑saving layout) |
| Weight (incl. accessories) | 4,800 kg | Lightweight alloy frame (up to 15% reduction) |
| Control System | PLC with NMEA‑2000 output | Integrated DCS module, remote diagnostics |
All figures are typical; engineering teams can adjust tube layout, burner capacity, and instrumentation to meet specific vessel stability calculations and regulatory constraints.
We accept single‑unit orders for prototype or pilot installations. Volume discounts apply from a batch of five units onward.
Yes. The base model supports heavy fuel oil and marine diesel. An optional dual‑fuel package (including LNG) can be engineered without altering the main pressure vessel.
Standard production runs ship within 30‑45 days after final design approval. Highly customized configurations may require 60‑90 days, depending on material availability.
All units come with a 24‑month warranty covering manufacturing defects and a 12‑month optional extended service plan. Our technical service network provides 24/7 remote assistance and on‑site commissioning.
Ready to equip your capsize bulk carrier with a reliable steam source?
Contact Our Engineering Team Today