Our marine boiler acid washing procedure shipyard is engineered to remove scale, rust, and oil‑based deposits that degrade heat‑transfer efficiency. The method follows a four‑step cycle: (1) pre‑inspection and isolation, (2) controlled acid circulation, (3) neutralisation and flushing, and (4) post‑wash performance verification. Each step is executed under strict pressure‑ and temperature‑control to protect boiler tubing and ancillary components while achieving >95 % deposit removal in a single 6‑hour window.
The offering includes a calibrated acid‑delivery kit, on‑site safety package, detailed procedure manual, and a qualified engineering team that oversees the entire wash. Designed for medium‑ to large‑scale shipyard boilers (150 kW – 30 MW), the solution integrates seamlessly with existing plant control systems, minimizing downtime and ensuring compliance with IMO and MARPOL regulations.
| Parameter | Range | Unit |
|---|---|---|
| Boiler Capacity | 150 – 30,000 | kW |
| Acid Concentration (max) | 10 – 15 | % |
| Circulation Pressure | 1.5 – 3.5 | bar |
| Temperature During Wash | 50 – 80 | °C |
| Typical Downtime | 6 – 8 | hours |
| Lead Time (full package) | 15 – 45 | days |
The acid washing system complies with ISO 14001 environmental management standards and is aligned with IMO Resolution MEPC.71(57) regarding ballast‑water treatment chemicals. All handling equipment carries CE marking for pressure vessels, and the procedure manual references ASME Boiler and Pressure Vessel Code Section VIII for safe operation.
We work on a per‑project basis; there is no fixed MOQ. The kit and service are sized to the boiler’s rated output, so a single 2 MW unit can be serviced independently.
Yes. Our engineering team conducts a pre‑wash survey and recommends a concentration within the 10‑15 % range that matches the material grade and deposit thickness of legacy boilers.
The procedure includes a 12‑month performance guarantee. Should post‑wash efficiency fall below the agreed threshold, we will conduct a complimentary re‑wash at no additional cost.
Absolutely. The chemistry and temperature profile are compatible with both oil‑fired and gas‑fired configurations; the only variation is the pre‑heat duration, which our technicians adjust on‑site.
Ready to reclaim boiler efficiency and lower operating costs? Contact our technical sales team today to receive a tailored quotation and schedule a site assessment.
Send Inquiry