The marine boiler for Aframax crude oil tanker is engineered to meet the demanding steam‑generation requirements of mid‑size oil carriers that transport up to 800,000 barrels of crude per voyage. Designed for continuous duty cycles, this boiler delivers reliable thermal power for cargo heating, fuel oil pre‑heating, and auxiliary systems while complying with the strict classification societies and environmental regulations governing international shipping.
| Parameter | Range / Option | Unit |
|---|---|---|
| Steam output (rated) | 6 000 – 12 000 | kg/h |
| Design pressure | 2.5 – 3.0 | MPa |
| Operating temperature | 180 – 250 | °C |
| Fuel type | Heavy fuel oil, Marine diesel, Dual‑fuel | – |
| Overall dimensions (L×W×H) | 4.2 – 7.0 m × 2.0 – 3.5 m × 2.8 – 4.0 m | m |
| Weight (dry) | 12 000 – 22 000 | kg |
| Certifications | ABS, DNV‑GL, Lloyd’s Register | – |
All dimensions and performance data can be tailored to ship‑specific space constraints and steam demand profiles.
Our boiler platform is fully certified by the leading classification societies—American Bureau of Shipping (ABS), DNV‑GL, and Lloyd’s Register. The design complies with the International Maritime Organization (IMO) regulations for pressure vessels, including SOLAS Chapter II‑1 and MARPOL Annex VI. All safety valves, pressure gauges, and emergency shutdown systems meet ISO 16584‑1 standards, ensuring reliable operation under high‑sea stress conditions.
In addition to mandatory certifications, we provide optional third‑party testing for low‑NOx burners and carbon‑capture ready configurations, allowing shipowners to future‑proof their fleet against evolving environmental legislation.
We work directly with shipyards and owners; the MOQ is one complete unit, with the ability to scale production for multiple sister vessels in the same class.
Yes. Our modular burner system can be configured for heavy fuel oil, marine diesel, or a dual‑fuel setup without major redesign, providing flexibility for fuel‑price volatility.
Standard production runs require 30‑45 days after engineering approval. For highly customised layouts, lead time may extend to 60 days, with detailed schedule provided during the quotation phase.
All units carry a 24‑month warranty covering material and workmanship. We also offer optional extended service contracts, on‑site spares packages, and 24/7 technical hotline support for rapid troubleshooting.
Ready to equip your Aframax tanker with a reliable, low‑emission steam solution?
Contact Our Engineering Team Today