Modern vessels demand reliable steam generation that can survive harsh seas and tight space constraints. Our vertical water tube marine boiler is engineered to deliver high‑efficiency steam while fitting into limited engine‑room footprints. The design follows the latest vertical water tube marine boiler specifications, ensuring consistent pressure, rapid start‑up, and compliance with international maritime standards.
From offshore supply ships to coastal ferries, our boilers are the backbone of steam‑driven auxiliaries—cargo pumps, fuel‑oil heaters, and deck‑machinery. Engineers appreciate the modular tube arrangement that tolerates thermal cycling, while ship owners value the reduced maintenance intervals that keep vessels on schedule.
| Parameter | Typical Range | Units |
|---|---|---|
| Design Pressure | 12 – 30 | Bar(g) |
| Rated Steam Output | 500 – 4,500 | kg/h |
| Operating Temperature | 350 – 450 | °C |
| Fuel Types | Heavy fuel oil, Marine diesel, LNG (optional) | – |
| Water‑Tube Material | High‑alloy steel (SA‑387/SA‑533) | – |
| Control System | Digital PLC with remote monitoring | – |
| Dimensions (H × D) | 2.5 – 4.0 m × 1.2 – 1.8 m | m |
| Weight (Dry) | 8,000 – 22,000 | kg |
These figures are a baseline; our engineering team will adjust tube count, burner capacity, and control logic to match the exact load profile of your vessel. All options are documented in a full set of vertical water tube marine boiler specifications for your project dossier.
Marine boilers operate under stringent classification rules. Our units are built to satisfy the requirements of ABS, Lloyd’s Register, and DNV‑GL, as well as IMO’s MARPOL Annex VI for emissions. Key safety features include:
We accept single‑unit orders for prototype or low‑volume projects. Volume discounts apply from a 3‑unit production run onward.
Yes. An optional LNG burner kit is available, and the conversion is reflected in the final specifications sheet.
Standard configurations ship within 25–40 days after purchase order receipt. Fully customized designs may require 45–60 days, depending on engineering scope.
All units carry a 24‑month warranty covering material and workmanship. We also offer on‑site commissioning, training, and a 24/7 technical hotline for the warranty period.
Ready to align your vessel’s steam system with the most reliable vertical water tube marine boiler on the market? Submit your technical brief today and receive a detailed specification package, lead‑time forecast, and a no‑obligation quotation.
Contact Sales