Our deionized water pure steam generator factory direct solution delivers high‑purity steam for semiconductor fabs, pharmaceutical sterilization, food‑processing lines, and power‑plant feed‑water systems. Designed for seamless integration, the unit eliminates the need for third‑party distributors, giving you cost‑effective access to a reliable source of contaminant‑free steam straight from the manufacturing floor.
1. Deionization Module: Feed water passes through a twin‑bed ion‑exchange system (cation followed by anion) that removes 99.9% of dissolved salts and metallic ions, achieving resistivity of ≥18 MΩ·cm.
2. Pre‑Heat Exchange: The purified water is pre‑heated using a recuperative heat‑exchanger that recovers waste heat from the steam outlet, improving overall energy efficiency by up to 15%.
3. Steam Generation Chamber: A stainless‑steel, 316L pressure vessel equipped with a high‑efficiency electric or gas boiler converts the pre‑heated water into saturated or super‑heated steam, depending on the selected control mode.
The closed‑loop design prevents re‑contamination, while the PLC‑based controller provides real‑time monitoring of temperature, pressure, and conductivity, ensuring steam purity stays within ISO 9001‑compatible limits.
| Parameter | Standard Range | Optional Upgrades |
|---|---|---|
| Steam Output | 5 kg/h – 200 kg/h | Up to 500 kg/h with parallel modules |
| Operating Pressure | 0.2 – 2.5 MPa | High‑pressure option up to 5 MPa |
| Water Resistivity | ≥18 MΩ·cm | Ultra‑pure (≥20 MΩ·cm) with additional polishing |
| Energy Source | Electric (380‑415 V) / Natural Gas | Steam‑assisted or waste‑heat recovery |
| Control Interface | Local HMI (7” touch screen) | Remote SCADA integration, Modbus/TCP |
| Duty Cycle | Continuous (≥8,000 h/yr) | Enhanced cooling for 12,000 h/yr |
By sourcing your deionized water pure steam generator factory direct, you bypass middle‑man mark‑ups and receive a unit that matches your exact process requirements. Our engineering team offers:
We accept orders as low as a single unit for most standard models. For highly specialized configurations (e.g., ultra‑high pressure or bespoke control systems), the MOQ is typically 3 units to optimize tooling and certification costs.
Yes. Our control hardware supports Modbus/TCP, Profibus, and OPC-UA out‑of‑the‑box. Our engineers will map your existing tags and provide a complete integration package, including wiring diagrams and firmware updates.
All units ship with a standard 24‑month parts‑and‑labor warranty. We also offer optional 3‑ or 5‑year extended warranties, on‑site preventive maintenance contracts, and a dedicated technical hotline available 24 hours a day, 7 days a week.
Typical lead time ranges from 15 to 45 days after the engineering sign‑off, depending on capacity and optional features. Rush orders can be expedited to 10 days for standard models, subject to a surcharge.
Ready to eliminate contaminants from your steam supply while reducing total cost of ownership? Reach out today for a free feasibility study, a detailed quotation, or to schedule a virtual walk‑through of the system.