A robust inspection door for CFB boiler cyclone separator provides safe, rapid access to the interior of the cyclone vessel for cleaning, inspection, and repair. Designed for the harsh environment of circulating fluidized‑bed (CFB) boilers, the door combines high‑temperature alloy construction with precision sealing to maintain pressure integrity while minimizing downtime.
| Parameter | Standard Range | Optional Up‑grade |
|---|---|---|
| Nominal Size (Ø × H) | 600 mm × 400 mm – 1500 mm × 900 mm | Custom dimensions up to 2500 mm × 1500 mm |
| Material | 304L SS, 310S SS | Inconel 718, Hastelloy C276 |
| Design Pressure | ≤ 2.5 MPa (25 bar) | ≤ 4.0 MPa (40 bar) |
| Design Temperature | ‑30 °C to 650 °C | ‑30 °C to 800 °C (with special alloy) |
| Sealing System | PTFE‑reinforced double gasket | Metal‑to‑metal C‑ring |
| Locking Mechanism | Quarter‑turn lever | Pneumatic actuation |
All dimensions and material grades can be tailored to match the specific cyclone geometry and plant operating envelope.
CFB boiler cyclone separators operate under continuous high‑temperature, high‑velocity gas flow. Routine inspection is essential to prevent fouling, erosion, and to verify the integrity of internal baffles. The inspection door enables:
Unlike generic access panels, our door is engineered from the same high‑grade alloys used in the cyclone shell, guaranteeing thermal expansion compatibility. The patented “dual‑seal” concept eliminates leakage paths that can cause unplanned shutdowns. Additionally, our engineering team offers OEM‑level support: CAD drawings, finite‑element stress analysis, and on‑site installation guidance at no extra cost.
We accept orders from a single unit upward. For standard sizes the lead time is 15 days; custom dimensions start at a MOQ of 2 units to justify tooling.
Yes. The flange is designed for bolted attachment using pre‑drilled holes on the separator shell. No permanent welding is required, which preserves the original certification of the vessel.
All doors ship with a 24‑month warranty covering material defects and seal performance. Our technical hotline is available 24 × 7 for troubleshooting and spare‑part logistics.
The product conforms to ASME Section VIII, CE pressure‑equipment directives, and relevant API standards. All heat‑treated components carry material certificates upon request.
Ready to keep your CFB boiler running at peak efficiency?
Contact our engineering team today