Our soap and detergent factory industrial steam boiler delivers high‑temperature steam on demand for batch‑wise and continuous manufacturing lines. Engineered for the rigorous duty cycles of surfactant synthesis, the boiler integrates a robust fire‑tube design with advanced control logic to maintain pressure stability even during peak loads. The unit is supplied as a turnkey solution – from engineering design and certification to on‑site commissioning – ensuring minimal downtime and predictable operating costs for large‑scale detergent producers.
The system is built with corrosion‑resistant carbon steel, optional stainless‑steel water‑walls, and a low‑NOx burner that meets the latest environmental directives. Whether you need 2 ton/h or 20 ton/h steam capacity, the boiler can be customized to match your process flow, water‑quality profile, and energy‑source preference (natural gas, LPG, or dual‑fuel).
The boiler is the heart of several key processes in a detergent plant:
Because the steam quality is consistently dry (≤5 % moisture), downstream equipment experiences less fouling, extending maintenance intervals and preserving product quality.
| Parameter | Standard Range | Optional Upgrade |
|---|---|---|
| Steam Capacity | 2 – 20 ton/h | 30 ton/h (custom design) |
| Design Pressure | 1.0 – 2.5 MPa | Up to 4.0 MPa |
| Fuel Type | Natural Gas, LPG | Dual‑fuel (Oil + Gas) |
| Control System | PID with LCD panel | Remote SCADA integration |
| Water‑Wall Material | Carbon steel (A36) | Stainless steel (SS304/SS316) |
| Warranty | 24 months parts & labor | Extended 36 months (optional) |
All parameters can be fine‑tuned during the engineering phase to align with your plant’s process flow diagram and utility network.
We accept projects starting from a single unit; the only constraint is the selected capacity range. Larger capacities may benefit from volume discounts, but the design team will work with you regardless of order size.
Yes. The burner housing is modular, allowing retro‑fit of low‑NOx, low‑sulfur kits. For biogas, a premixer can be installed to ensure stable flame quality; the control software will automatically adjust the air‑fuel ratio.
Standard lead time is 15‑45 days, depending on capacity and optional features. Complex customizations (e.g., SCADA integration or stainless‑steel water walls) may extend the schedule by an additional 10‑15 days.
Full installation, pressure testing, and performance verification are part of the delivery package. Our engineers remain on‑site until the boiler achieves the agreed‑upon efficiency and safety parameters, then provide a comprehensive hand‑over report.
Ready to power your detergent production with a robust, energy‑efficient steam source? Contact our technical sales team for a no‑obligation quotation and a preliminary plant audit.
Email Sales Now