When a plant specifies a stainless steel feedwater tank for clean steam boiler, the expectation is simple: a reliable, corrosion‑resistant vessel that delivers pure water at the exact flow rate required by the boiler system. Our tanks are engineered to meet that expectation on every installation, whether you are upgrading an existing plant or commissioning a new generation of high‑efficiency boilers. The result is reduced downtime, lower maintenance costs, and steam quality that stays within the strict limits set by process engineers.
Our feedwater tanks are fabricated from 304/316 grade stainless steel, offering exceptional resistance to oxidation, scaling, and aggressive boiler‑water chemistries. Each tank is supplied with a hygienic, food‑grade interior finish, a welded‑on overflow, and a precision‑machined inlet/outlet manifold that integrates seamlessly with standard boiler piping. The design follows ASME Boiler & Pressure Vessel Code, guaranteeing structural integrity under continuous duty cycles and pressure fluctuations typical of industrial steam generation.
The versatility of our stainless steel feedwater tank makes it the preferred choice across multiple sectors:
| Parameter | Range | Unit | Notes |
|---|---|---|---|
| Capacity | 500 – 25 000 | Liters | Custom volume per project |
| Material Grade | 304 / 316 | Stainless Steel | 316 for high‑chloride environments |
| Operating Pressure | 0.2 – 1.6 | Bar (gauge) | Design complies with ASME Section VIII |
| Temperature Range | 5 – 120 | °C | Continuous operation |
| Inlet/Outlet Size | DN50 – DN200 | Metric | Flanged, quick‑connect optional |
| Warranty | 12 | Months | Standard, extendable on request |
We accept single‑unit orders for all standard capacities. For engineered‑to‑spec models above 10 000 L, the MOQ is typically two units to optimize material utilization.
Yes. While 304 stainless steel covers most environments, we offer 316 grade on request for high‑chloride or marine applications.
Standard stock sizes ship within 15 – 25 days after order confirmation. Fully engineered designs require 30 – 45 days, depending on complexity and material availability.
Our engineering team can supply detailed installation drawings, on‑site supervision, and a trained technician for critical projects at an additional service fee.
Contact our sales engineering team today for a free quote, technical drawing, or to discuss how a stainless steel feedwater tank can improve your steam‑generation efficiency.