Our field retrofitting service for hydrogen ready boilers transforms existing fossil‑fuel units into clean‑hydrogen capable assets with minimal plant‑down time. Engineered for utilities, petrochemical complexes, and large‑scale manufacturing sites, the service delivers a turnkey solution that meets the strict reliability, safety, and emissions standards required by modern energy strategies.
Our on‑site engineering team follows a four‑stage workflow designed to protect your production schedule:
The entire process is managed by a single project lead, ensuring traceability from design approval through final hand‑over.
| Parameter | Range | Unit |
|---|---|---|
| Boiler Capacity (retrofit) | 5 – 250 | MWth |
| Hydrogen Blend Ratio | 0 – 30 | % (by volume) |
| Maximum Operating Pressure | 1.0 – 3.5 | MPa |
| Retrofitting Downtime | 0.5 – 3 | days |
| Control System Upgrade | DCS / PLC integration | – |
All parameters are adaptable to the specific boiler model and the intended hydrogen mix, allowing you to align the retrofit with your decarbonisation roadmap.
Our service is project‑based, so there is no fixed MOQ. We evaluate each plant individually and provide a cost estimate that reflects the boiler size, existing instrumentation, and desired hydrogen blend.
Yes. The retrofit kit is engineered to support blends from 0 % up to 30 % hydrogen. Higher ratios can be accommodated on request, subject to additional safety analysis and component certification.
Standard projects require 15–45 days, depending on component availability and site logistics. Complex installations involving extensive piping modifications may extend the schedule, which we outline in the project plan.
All retrofit components carry a 24‑month warranty against manufacturing defects. The installation service includes a 12‑month performance guarantee, with the option to extend through a service contract.
Ready to future‑proof your heating assets?
Contact Our Engineering Team Today