In marine propulsion and auxiliary systems, maintaining clean boiler water is critical for efficiency and safety. Our marine boiler scum valve right angle type provides a compact, high‑performance means to discharge scum and non‑condensable gases from the steam drum without interrupting operation. Designed for the harsh marine environment, the right‑angle configuration fits tight pipe runs and simplifies integration into existing boiler loops.
The valve features a spring‑loaded pop‑petcock that automatically opens when steam pressure exceeds the preset set‑point, allowing accumulated scum to be expelled through the angled outlet. When pressure falls below the threshold, the spring forces the seat shut, preventing back‑flow and maintaining system integrity. The right‑angle design minimizes pipe length, reduces pressure drop, and eliminates the need for additional elbows or fittings.
| Parameter | Typical Range | Notes |
|---|---|---|
| Valve Body Material | Carbon steel (ASTM A105) / Stainless steel (ASTM A351) | Select based on corrosion level |
| Size (DN) | 15 – 200 | Matches standard marine pipe dimensions |
| Pressure Rating | PN 2.5 – PN 16 (≈ 250 – 1600 kPa) | Conforms to EN 13366 |
| Operating Temperature | -20 °C to +250 °C | Suitable for steam and condensate |
| Set‑point Adjustment | 0.5 – 2.0 MPa (spring‑type) | Tool‑adjustable without disassembly |
| Connection Type | Flanged, threaded, or welded | OEM/ODM options available |
The valve is ideally suited for:
Our standard MOQ is 10 units for a single size and material. For mixed‑size or OEM‑branded orders, we can accommodate as low as 5 units per variant, subject to tooling requirements.
Yes. The spring‑loaded mechanism is accessible from the exterior of the valve body; a qualified technician can fine‑tune the opening pressure with a simple wrench, no disassembly required.
All units comply with EN 13366 (Steam Boiler Valves) and meet ABS and Lloyd’s Register requirements for marine installations. Material certifications (ASTM, DIN) are provided on request.
Standard stock items ship within 15 days. Custom sizes, material upgrades, or OEM branding extend the lead time to 30–45 days, depending on order volume.
Ready to improve boiler efficiency and reduce maintenance costs? Contact our sales engineers for a no‑obligation quotation, technical drawing review, or sample order.
Email Sales Team