A reliable ph adjuster for clean steam generator feedwater system is the cornerstone of corrosion‑free operation in modern power‑plant boiler circuits. By maintaining the feedwater pH within the narrow window required for high‑purity steam, the unit prevents metal attack, reduces scale formation, and safeguards turbine efficiency. Engineered for continuous duty, the adjuster delivers precise acid or caustic dosing based on real‑time conductivity and temperature data, ensuring that the feedwater entering the steam generator meets the strict chemical specifications demanded by OEM guidelines.
The system integrates a stainless‑steel dosing pump, a pH sensor with auto‑calibration, and a programmable logic controller (PLC) that can be linked to existing Distributed Control Systems (DCS). Its modular design allows retrofits on legacy plants and seamless expansion for new installations.
| Parameter | Typical Range | Units |
|---|---|---|
| Dosing Pump Flow Rate | 0.5 – 15 | L/h |
| pH Sensor Accuracy | ±0.02 | pH unit |
| Operating Temperature | 5 – 80 | °C |
| Material of Construction | 316L SS (wetted), 304 SS (external) | – |
| Control Interface | Modbus TCP/IP, Profibus, OPC‑UA | – |
| Power Supply | AC 220‑240 V, 50/60 Hz | – |
| Warranty | 24 months | – |
All parameters can be adapted to meet site‑specific flow‑rate, temperature, or compliance requirements. Engineering support is provided to confirm optimal sizing before final order.
The adjuster is deployed across a variety of high‑pressure steam generation environments:
We accept orders as low as a single engineered system. Larger projects benefit from volume discounts, but there is no mandatory MOQ for standard configurations.
Yes. The unit ships with configurable communication modules (Modbus TCP/IP, Profibus, OPC‑UA) that can be mapped to any major Distributed Control System without additional hardware.
Standard models are delivered within 15‑30 days after order confirmation. Custom engineering, special certifications, or oversized pumps may extend lead time to 45 days.
All wetted components comply with ASTM A240, NACE MR0175, and IEC 60601‑1 for electrical safety. Documentation for CE, UL, and ISO 9001 quality management is available on request.
Contact our technical sales team today to discuss your specific steam‑generator requirements and obtain a quotation for a ph adjuster for clean steam generator feedwater system that meets your plant’s performance targets.
Email Sales